Timeline

Formlabs

Manufacturing Engineer
2021–Present

2026

  • Leading manufacturing development of a next generation 3D printer

2025

Mexico Aligner Production Project

  • Recommended by the COO for a temporary role rotation to lead end-to-end implementation of a high volume dental aligner production workflow using Form 4L printers along with specially developed software and material solutions at a Mexico based production facility
  • Debugged three critical technical issues during onsite pilot (CPU thrashing, file overwrite, print adherence)
  • Coordinated multidisciplinary work to make customer specific modifications (print settings changes, material modifications) while decreasing print time, improving part accuracy, and increasing packing density

Other Projects

  • Developed a structured template for NPI readiness by each product development phase. Adopted by each of four new generation NPI programs
  • Improved F4L BP Flex yields from ~70% to >99% through CNC DFM review

2024

  • Owned Form 4L backlight module product realization
  • Reduced LCD potting proudness failure rate from 18% to 2%, saving $300k annually
  • Sourced automation solution increasing resin cartridge RFID programming by 50%
  • Brought Form 4 and Form 4L BLU and LCD lines to stable mass production with 500k+ annual savings
F4L BP Flex F4L LCD Module F4L Backlight Module
Responsible for the manufacturing development of three core user replaceable subsystems

2023

  • Promotion to Manufacturing Engineer II
  • Owned Form 4 backlight module product realization
  • Managed schedule and technical readiness from quote through pre-production to mass production ramp
  • Designed, built, tested three fixtures for optical testing
  • F3L tank V3: improved from 87% to 91% print success, yields from 90% to >99%
  • Supported second sourcing and Vietnam mold transition cost downs for F3 resin tanks
Form 4 Backlight Unit. Engineered to supply collimated UV light to the print plane while maximizing optical power uniformity

2022

  • Owned sustained production of eight product lines (20 million dollars annual production)
  • Managed intern on projects including change tracking dashboard, measurement jig development, test fixture validation
  • Created live updating commodities usage tracking dashboard
  • Initiated ECO implementation reporting process across primary contract manufacturers
  • Spearheaded F3L tank yield improvement project yielding 700k annual scrap cost savings
Form 3L Tank Form 3 Tank

2021

  • Provided manufacturing support for tank products and print success metrics
  • Redefined quality and traceability standards for PMP film
  • Established JIRA project communication with contract manufacturing
  • Guided Wash and Cure L products through technical issues from PVT through mass production ramp
  • Built and tested jigs for laser module production